Data Migration Readiness Assessment (DMRA)

 


Migration as a Product: Fixed-Price SKU/Proposal.
 


A Data Migration Readiness Assessment (DMRA) for an Aimlux.ai consulting engagement is the "pre-flight check" that justifies the shift from a manual ETL project to a Migration-as-a-Product model. Using Equitus.ai DCS (powered by KGNN), the goal is to quantify the "Technical Debt" and "Risk Variance" of an Oracle-to-SAP/IBM DB2 move.

The following steps can be compiled into a digital costing analysis tool to provide a client with a  tokenized migration as a service model.




_________________________________________________



1. Inventory & Landscape Audit (The "Scope" Variable)

The primary cost driver in any migration tool is the sheer volume and complexity of the source data.

  • Database Object Count: Number of schemas, tables, and views in the Oracle environment.

  • Custom Code Identification: Quantifying stored procedures and triggers. (Manual migration costs scale exponentially here; DCS automates this via semantic mapping).

  • Data Volume Sizing: Total storage (TB/PB) to determine hardware requirements (e.g., IBM Power10 or Dell XR7620).



2. Semantic Complexity Scoring (The "Knowledge Graph" Variable)

Unlike standard "Lift and Shift," Equitus KGNN extracts facts and relationships.

  • Relationship Density: Assessing the "distance" between data points in legacy silos.

  • Unstructured Data Ingest: Evaluating the amount of PDF, JSON, or XML "document dumps" attached to Oracle records that need unification into the target system.

  • Redundancy & Cleansing Ratio: Identifying the percentage of "Cold" vs. "Hot" data to determine what actually needs to be moved to the high-performance SAP HANA/DB2 environment.



3. Risk & Compliance Variance

This section of the tool calculates the "Insurance Premium" of the migration.

  • Sovereignty Requirements: Is the migration happening on-premise due to HIPAA, SOX, or Defense regulations? (DCS on-prem minimizes the "Cloud Risk" cost).

  • Downtime Thresholds: Comparing the cost of a "Big Bang" migration vs. the DCS 30-day IOC / 60-day FOC rapid deployment model.

  • Data Provenance Audit: Calculating the cost to manually maintain an audit trail vs. the automated traceability built into KGNN.



4. Resource & GSI Labor Comparison

The costing tool must contrast the Aimlux SmartFabric model against a traditional Global Systems Integrator (GSI) project.

  • Manual vs. Automated ETL Hours: * Legacy: Estimated hours for a team of 10 data engineers over 12 months.

    • Aimlux: SKU-based pricing for DCS automated ingestion.

  • Training & Onboarding: Cost of training internal technical staff to manage the "living knowledge graph" post-migration.













5. Summary Table: Costing Tool Outputs

A professional assessment report would generate a table similar to this:

  • Job Titles: Oracle Database Administrator, Database Architect, Migration Architect, Head of Data Infrastructure.

  • Skills: PL/SQL, Oracle Database, Database Migration, SAP HANA, IBM Db2.

  • Groups: Oracle DBA Network, SAP S/4HANA Professional Group, IBM Power Systems.


  • Metric

    Traditional GSI Project (Manual)

    Aimlux/Equitus DCS (Automated)

    Timeline to IOC

    180–360 Days

    30 Days

    Full Go-Live (FOC)

    18+ Months

    60 Days

    Data Quality

    Raw Table Move

    Semantic Knowledge Graph

    Procurement Type

    T&M (Time & Materials)

    Prepaid SKU

    Risk of Failure

    High (Due to manual ETL)

    Low (Productized Migration)